SEWAGE TREATMENT
Buy water treatment plant
OVERVIEW
You are wondering how and where you can buy water treatment plant for your home or for your customers?
At Tricel we have the solution, we can provide you with a full range of wastewater treatment systems including :
to suit your project and site requirements.
We have also listed a summary of each off-main drainage system we provide, giving you an overview of the different options available and their treatment processes.
Once you have the results of your percolation tests and a recommendation from your engineer or architect regarding which system is suitable for your project, you might enquire about the price and where to buy your water treatment plant.
At Tricel, we offer site visits and advice regarding the off main drainage solutions to fit your needs and our range of products.
As well as standard septic tanks, sewage treatment plants and packaged filter systems, we can also provide pumping stations along with spare parts or accessories such as distribution boxes and risers for both domestic and commercial sewage treatment solutions.
See below where you can buy water treatment plant, our range of solutions and information about product availability and lead time.
If you have any questions, feel free to call us
Buy Sewage Treatment Plants from your local Builders Merchants
Ideal for:
- Builders and installers
- Straight forward installations
- Installation done by yourself
Buy from your local Recommended Installers
Ideal when:
- You’re a homeowner
- Installation is required
- Dealing with more complicated sites
- Secondary or tertiary treatment is required
Buy water Treatment Plant – Tricel’s range of off-main drainage solutions
See below the sewage treatment solutions available and suitable for new builds, upgrades, extensions & retrofits.
Our systems are cost-effective, easy to install, require minimal maintenance, have low running costs and have good effluent quality.
Tricel Vento – Low Profile Septic tank
- Shallow dig tank
- Strong & robust underground tank
- No electrical or moving parts
- EU Certified to EN12566-1
Tricel Novo – Sewage Treatment Plant
- Durable & long lasting SMC tank
- Shallow dig tank
- Easy installation (Plug and Play)
- Long life components
Tricel Puraflo – Packaged filter system
- Ideal for sensitive sites
- Compliant to British Standard
- Small footprint
- Secondary or tertiary treatment
Buying a sewage treatment plant: product availability and lead time
We supply both commercial sewage treatment plants and small domestic sewage treatment plants.
As a manufacturer, we ensure the best-sellers are available in stock.
Larger size plants can be manufactured to meet the customer’s timeline.
As a reference, the average lead time for 6-12 population Novo systems is 3 to 5 working days.
Once an order is placed and the delivery date is agreed, we will make sure the timeline is respected. We understand how disruptive late deliveries can be to a project.
We also work closely with our network of installers and builders merchants to make sure they can fulfil their orders. Deliveries directly to the site are also an option in case of short lead time or lack of storage space.
At Tricel, we also provide on-site support thanks to dedicated Area Sales Managers.
Articles you might be interested in
KEY FEATURES
Cost-Effective
Operating costs are reduced to
a minimum
quality
Sewage treatment plants are extremely reliable and durable as they are made out of long-lasting materials (20 to 40 years)
Certified
All Tricel Novo sewage treatment plants are tested to the highest quality standards and are EU Certified to EN12566-3
INSTALLERS NETWORK
UK wide network of recommended installers for your peace of mind
SEWAGE TREATMENT PLANTS
Plants available for all capacities, from 1PE up to 50PE. Free advice on request.
FAST DELIVERY
Fast delivery and rapid response to all our customers
Frequently Asked Questions
Yes, Tricel wastewater treatment plants are EN12566-3 certified. For more details, please see PIA’s certification test results.
Tricel septic tanks are certified EN12566-1.
It is a legal requirement for any treatment plant installed in the United Kingdom to meet the requirements of EN12566-3 series of standards approved by TC165 of the European Commission for Standardization. The testing process includes water tightness, structural strength, durability and treatment efficiency. The National Annex verifies their results.
Tricel Novo are made of GRP, a non-corrosive, strong and long-lasting material. The SMC structure carries a 20 years warranty.
All metals used in constructing the tank are stainless steel. All electrical and electromechanical equipment in the tank is guaranteed for one year.
Tricel plant equipment and components are designed to work effectively in the Tricel plant and will last for many years when used appropriately. Our guarantee begins on the date of purchase.
Tricel Vento, septic tanks, have a 10 years warranty.
Tricel sewage treatment plants and septic tanks come with comprehensive installation guides.
Before attempting installation, you should ensure that you can meet the requirements outlined in the guide. Your onsite engineer can advise you on specific site conditions, for example.
Get in touch