OVERVIEW
To install a septic tank or sewage treatment plant in Northern Ireland, it is mandatory to have:
- planning permission
- a building control inspection
- and a consent to discharge form (W02) from the Northern Ireland Environmental Agency (NIEA)
Be sure you have a consent to discharge in place BEFORE you buy any property or BEFORE you start construction on your site, regardless of the type of tank you will need.
You can get help from our distributor in Northern Ireland (Depawater) with completing your consent to discharge form or do it yourself on the Domestic Consents website from the Department of Agricultural, Environment and Rural Affairs.
Further down this page, you will find:
If you have any questions, feel free to call us
Northern Ireland consentment to discharge
Percolation Area & Wastewater Treatment Options
The NIEA still requires a consent to discharge form even if your septic tank or sewage tank was installed before January 1, 2015.
If a septic tank discharges directly to a watercourse, it needs to be upgraded immediately, and failure to do so will result in prosecution. More information is available in the General Building Rules for Septic Tanks.
Since a consent to discharge approval form is an essential part of the planning permission process, your architect may have taken care of this already. If they have not, or if you need help with the process, we are happy to help.
The consent application forms can be filled in by Tricel’s distributor in Northern Ireland: Depawater Ltd.
The Northern Ireland Environmental Agency (NIEA) requires an application fee. This fee is dependent on the chosen discharge option:
- Discharge to subsurface irrigation (soakaway) – £117
- Discharge to waterway – £292
Guide to filling in the consent to discharge form (WO2)
Guide to filling in the consent to discharge form (WO2)
As part of our application service, we will work closely with you throughout the process, offering :
- Discharge application processing and approval
- Percolation testing
- Tricel certified solutions for your site
- Custom design solutions to suit almost any site!
How to complete a Consent to Discharge (W02 Form) in Northern Ireland.
First, you need to know…
Do you discharge to a waterway or a soakaway?
Before filling out the consent form, determine whether your plant will discharge into a subsurface irrigation system (soakaway) or a waterway. The type of wastewater treatment system you choose will directly depend on this information.
See below our flowchart.
If you’re still unsure, contact us to discuss your project.
How to choose the most suitable type of sewage treatment system for you?
If you can’t connect your new residence to the main sewer line, you will need to use off-mains or stand-alone solutions.
Here are some options:
Standard Septic Tank
There should be approximately 100 metres of drainage field after a standard septic tank. A percolation test and NIEA approval are required.
Recommendation: Tricel Vento
95% BOD Sewage Treatment Plant
Installation of this option is possible with approximately 80-100 square meters of drainage field to the underground soakaway. A percolation test and NIEA approval are required.
Recommendation: Tricel Novo
97.5% BOD Sewage Treatment Plant
This option is available where final effluent can be piped directly into a watercourse (open ditch with water, stream or river) with approval from the NIEA. This option does not require a percolation test.
Recommendation: Tricel Vitae
TALK SEWAGE TREATMENT
To speak to one of our agents online
ASK FOR A QUOTE
Request a free quote today!
Key features
Fast Delivery
Fast delivery + Rapid response to all our customers
Certified
Tricel Products are certified to EN12566-1 and EN 12566-3 certified
Technical expertise
Unrivalled technical expertise by our team regarding wastewater treatment solutions
Get in touch