×

Country Selector

You are currently on the United Kingdom website

Domestic Sewage Treatment Plant

Tricel Novo sewage treatment plant in details

Tricel Novo is part of the Tricel sewage treatment plant range certified to CE12566-3. It has been developed to meet a need for efficient and compact sewage treatment solutions for domestic wastewater. Indeed, the installation of a soakaway or drainage field is not always possible due to site constraints such as space (a lack of) and/or soil (clay soil, for example, might not have a sufficient soakaway potential).

Moreover, with the 2020 changes to the septic tank regulations in England and Wales, upgrades of existing septic tanks discharging directly to a watercourse are mandatory. Compact wastewater treatment plants such as the Tricel Novo represent cost-effective solutions to such upgrades.    

Let’s now see how a wastewater treatment plant works and what processes are used?

 

Tricel Novo wastewater treatment plant

How does a Tricel Novo sewage treatment plant work? The technology used.

Fixed culture

First of all, Tricel designed the Tricel Novo with a fixed culture treatment process. What is fixed culture, you may ask? It is the process used to create a base of development for the bacteria present in the tank. The bacteria multiply until they reach an optimum level for the treatment of your sewage water. To achieve this, Tricel uses a bacterial honeycomb carrier. The optimum is reached depending on the volume of wastewater to be treated by the treatment unit.

For example: for a Novo UK6, the number of bacteria in the tank will not be the same as if there are two or if you are four occupants in a house.

What happens if the number of inhabitants changes?

The number of bacteria will then adapt to best treat your wastewater (within the limits of the tank). This is particularly the case when you receive friends or family during the holidays.

The opposite is also true when the sewage treatment plant is no longer “fed” with wastewater, the number of bacteria decreases. For example, when you go on holidays for several weeks, the number of bacteria will be reduced. On your return, it is, therefore, advisable to pour into the toilet, a packet of biological activator or an old yogurt. This will help the number of bacteria to increase rapidly.

 

How does a sewage treatment plant work?

The Tricel Novo has three separate compartments in its tank.

  • The first is used for primary treatment. It separates solids, fats and liquids. The solids go to the bottom of the tank, the grease on the surface.
  • The second is for aeration and oxygenation. In this stage, the bacteria will feed on waste and remove it from the liquid. They are sustained with air which is continually supplied and flows through the filter media.
  • The final settlement chamber is used to treat the effluent one last time and to separate residual materials (suspended sludge) that would still be in the water.

Once the process is complete, the treated liquid now meets the required standard and can be discharged from the tank via the outlet.

 

How much does a sewage treatment plant cost?

What is the price of a Tricel Novo? With or without installation?

Product price only

The price of our products may vary according to several criteria:

  • The size of the tank needed
  • The region/area you leave in
  • The options chosen (pump or gravity for example)


As a guideline, please see below the prices of a Tricel Novo.

Novo typePrice range
Tricel Novo UK6 (1-6 PE)£1850 - £2000
Tricel Novo UK8 (2-8 PE)£2315 - £2400
Tricel Novo UK10 (3-10 PE)£2480 - £2520

All the prices above are indicative only. They may vary depending on your area, site conditions and options required. Contact us to request a bespoke quote.

 

Price with installation

The price with installation is always difficult to determine without a prior site visit. Indeed, each project is unique and several criteria come into play.

Do you need to have your old tank removed?

Do you have your own digger?

Would you like a price with delivery? With installation? With landscaping?

The best way to get a price for your project is to request a quote. When you request a quotation or price on our site, we adapt to your needs and your project.

 

What size sewage treatment plant do I need?

The most common model on the UK market is the Tricel Novo UK6, designated by Tricel to meet the needs of homes from 1 to 6 people.

In order to know what size wastewater treatment plant you need, you must find out how many people your dwelling can accommodate.


Following the British water flows and loads 4, the following applies:

Number of bedroomsMinimum PETricel Novo Recommendation
Property with 3 bedroomsminimum 5 PE systemTricel Novo UK6
Property with 4 bedroomsminimum 6 PE systemTricel Novo UK6
Property with 5 bedroomsminimum 7 PE systemTricel Novo UK8
Property with 6 bedroomsminimum 8 PE systemTricel Novo UK8

 

How to request a quote for a sewage treatment plant?

  1. Fill in a contact form on our website
  2. A member of our technical team will contact you
  3. We will study your project
  4. We might schedule a site visit to verify the site
  5. A bespoke quote is sent to you

 

Is the Tricel Novo certified?

Tricel’s Novo sewage treatment plants are tested and are certified to the European certification CE12566-3.

The certification tests each plant for strength, water tightness, durability and treatment efficiency. By using a wastewater treatment plant which is CE certified, you can rest assured that it has complied with tests and inspections which guarantee a high level of security and efficiency.

 

What are the warranties?

The warranties on the Tricel Novo in the UK mainland are as follows:

  • 3 years on mechanical parts
  • 20 years on the SMC structure

 

If you require any further information or would like to discuss your project, please don’t hesitate to contact us.

 

Call us Today for a FREE quote!

If we didn’t answer all your questions and you need more information we will help you