SEWAGE TREATMENT PLANTS

Commercial Wastewater treatment plant installed in Scotland

Case study overview

Date

June 2018

Location

Glen Nevis (Fort William)

Industry Sector

Commercial – Hostel

Product Used

Tricel Optima Sewage Treatment Plant (100 pop)

Project Introduction

Glen Nevis Youth Hostel is located just outside Fort William and at the foot of the UK’s highest mountain Ben Nevis. This case study is a commercial wastewater treatment plant in scotland.

THE CHALLENGE

parties involved in upgrading the commercial wastewater treatment plant

The hostel was going through major refurbishment works (brand new hostel) and in need of a new sewage treatment solution to cater for the staff and guests. The hostel’s facilities include private en-suite rooms as well as shared accommodation, a self-catering kitchen, a laundry room and an open-plan living room.

Ogilvie Construction was the chosen building contractor to manage the new build project. With more than 70 years experience in the construction industry in Scotland, this family owned company has a proven record of excellent working relationships with its clients.

Ogilvie Construction sourced the Tricel commercial sewage treatment plant through Keyline.

Keyline is one of the UK’s leading specialist of civil and drainage solutions. With more than 60 branches in the UK, they provide a wide range of building materials in stock to ensure customers receive products to complete projects on time.

Finally, Tricel sourced Xoli Ltd to commission the commercial wastewater treatment plant once the installation was completed. Xoli are experts in wastewater treatment and drainage industry. They can provide guidance regarding sewage treatment solutions as well as servicing a wide range of commercial products.

The Installation

The beginning of the year 2018 was particularly tricky for the building industry as site conditions were less than ideal. Indeed, the year started particularly cold and wet. Winter lasted longer than one would have imagined which led to many delayed projects.

The installation of the 100 pop Tricel Optima sewage treatment plant was also affected by the weather and poor site conditions. Working alongside Keyline and hand in hand with Ogilvie Construction, we were able to delay the delivery and original installation date until the site was ready. We kept the Optima wastewater treatment plant in stock until it was required on site.

Commercial Sewage treatment plant in Scotland

TRICEL SOLUTION

Tricel supplied a suitable 100 pop Tricel Optima commercial wastewater treatment plant to cater for the wastewater treatment requirements of Glen Nevis Hostel and site conditions. We also offered technical support and dealt directly with the building contractor, ensuring peace of mind to our customer. Finally, once the installation was completed, we also organised for a wastewater specialist, Xoli Ltd, to do the commissioning of the system.

The Feedback

Read below feedback from Billy Sutherland from Ogilvie Construction, the building contractor for this project.

“Absolutely perfect, definitely one of the better tanks we have installed, all went smoothly except the weather. Any questions we had were answered quickly by you and your team and the commissioning went ahead seamlessly. Will be recommending you to the buying team for any upcoming projects I am involved in.”

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Case Studies

Installation of Tricel Novo UK 18 in Devon

Tricel supplied a Novo UK 18 to replace an outdated septic tank in Devon. (Sept 2021)


2 min 30

Sewage treatment Installation

The aim was to find the perfect sewage treatment solution for a barn conversion and thus, upgrade their existing septic tank installation in line with their future projects. (Aug 2018)
3 min

Sewage treatment plant for selfbuilders

Only one week after the consent to discharge being granted, the installation process began. It then took only two days to complete the project. (Aug 2016)
3 min

Commercial sewage treatment plant and packaged filter system

Tricel worked with Carriden Homes in Crail (Scotland) to supply a sewage treatment plant and packaged filter system for bungalows. (Dec 2019)
2 min

Tricel Maxus Sewage Treatment Plant in Oykel Bridge

Tricel supplied a 92PE Tricel Maxus system with buffer tank for Oykel Bridge Hotel. (Dec 2021)
3 min 30

Commercial sewage treatment plant installed in Dorset

Tricel supplied a Novo UK 42 to replace an outdated septic tank in Dorset. (April 2021)
2 min 30

Cesspool replacement in Kent

Replacement of an existing cesspool by 3x Tricel Novo. (April 2022)
4 min

Septic tank upgrade, sewage treatment plant in Wiltshire

A Tricel sewage treatment plant was installed in Wiltshire to replace an old, failing septic tank. (March 2022)
2 min 45

See all Case studies

Source through all of our successful projects

Get in touch