SEWAGE TREATMENT PLANTS
Sewage Treatment Plant in Whitchurch, North Wales
Case study overview
Project Introduction
Read this project of Sewage Treatment Plant in Whitchurch North Wales. This Case study is about the upgrade of a non-compliant system with little disturbance.
Request a quote for your project today!
THE CHALLENGE
Wilson Brothers Contractors Limited was the chosen building contractor to upgrade a non-compliant system with little disturbance. With over 10 years of experience, it is one of the leading groundworks contractors in North Wales. The business is run by a family, using the latest machines and providing a personal touch to meet their customers’ needs.
Tricel provided a suitable sewage treatment system for two dwellings with a Tricel Novo UK 12, the correct size for two properties.
The project included a new sewage treatment plant and re-routing all drains from two properties. A minimal amount of disturbance is made in the nicer areas of the lawn, and larger areas are left ready for reseeding. At one point, there were three sizes of digger on site.
The Installation
The size of the tank dictates the amount of space needed when de-sludging a plant. Tanks must be held down during transportation by nylon straps in order to lower the Tricel Novo.
TRICEL SOLUTION
The solution we used : Tricel Novo
The Tricel Novo submerged aeration sewage treatment plant is suitable for domestic and light commercial or communal applications.
The plant offers its own treatment system while using simple proven fixed bed technology.
The Feedback
“From start to finish, nothing was too much trouble for them. Quite a major project consisting of a new sewage treatment system and re-routing all drains from two dwellings’ minimal disturbance in the nicer and larger areas left ready to reseed. We had three different sizes of digger on the place, the right tool in the right hands, indeed doing the right job. They explained every process, a pleasure to have on our property.
I would have no hesitation in strongly recommending this company or in using them again in the future. We are new to the area and a little nervous about unknown companies, but quickly became at ease with them, very professional in all aspects, 10/10.”
IF YOU NEED MORE INFORMATION
Call us now to talk about your project and we will answer your questions or concerns.
ASK FOR A QUOTE
Request a free quote today to have a quote that meets your project!
Case Studies
Installation of Tricel Novo UK 18 in Devon
Sewage treatment Installation
Sewage treatment plant for selfbuilders
Commercial sewage treatment plant and packaged filter system
Tricel Maxus Sewage Treatment Plant in Oykel Bridge
Commercial sewage treatment plant installed in Dorset
Cesspool replacement in Kent
Septic tank upgrade, sewage treatment plant in Wiltshire
Get in touch