We value your privacy

Our website uses cookies to enhance your experience. By continuing to use our website, you are agreeing to our use of cookies. Necessary cookies are always enabled. You can read more about our Cookie Policy in our Privacy policy

We value your privacy

Cookies are small text files stored on your computer by websites you visit. They help users navigate websites efficiently and enable certain essential functions. Cookies necessary for the website to function properly can be set without your consent, while all other cookies require your approval before being used in your browser.

Additionally, we use cookies to gather data for personalizing and evaluating the effectiveness of our advertising. For more information, please refer to the Google Privacy Policy.

You can find the list of all the cookies that we use on our website here.

sewage treatment plants essex

Sewage Treatment Plants Essex – Residential Upgrade

sewage treatment plants essex

Project info

Date

July 2025

Location

Braintree, Essex

Industry Sector

Residential

Installer

Basement Pumps

Product Used  

Novo UK6

Tricel Solution

After assessing the site conditions, Basement Pumps recommended our UK6 pumped sewage treatment plant, a system known for its reliability in high water table areas. The homeowners also appreciated the design and performance of our Novo range, which reinforced their confidence in choosing the UK6 pumped unit.

This solution offered:

  • Full compliance with UK drainage regulations
  • Effective treatment and discharge via a drainage field
  • Pumped capability to handle high groundwater levels
  • A robust, low-maintenance system suited to residential use

Sewage treatment plants Essex

A homeowner in Essex required an urgent upgrade to their existing wastewater system after discovering that their septic tank was both illegal and discharging into an unsuitable ditch. With strict environmental regulations in place, the property needed a modern, fully compliant solution. They contacted specialist installers Basement Pumps, who recommended a reliable and efficient sewage treatment system that could operate effectively despite the high water table on-site.

The Challenge

The property faced several significant issues:

  • An illegal septic tank that was no longer compliant with current regulations.
  • A failed pitch fibre drainage system that could not be repaired.
  • The location had a high water table, requiring a pumped solution capable of delivering consistent performance.

To meet legal standards and ensure long-term reliability, a complete system upgrade was necessary.

Installation

The installation team from Basement Pumps completed the full upgrade over five days. Their work included:

  • Decommissioning and safely removing the illegal septic tank
  • Installing a new drainage field suitable for treated discharge
  • Fitting and commissioning the UK6 pumped sewage treatment plant
  • Ensuring all pipework, pumps, and controls were fully operational and compliant

The installation was carried out professionally, with minimal disruption to the homeowners.

Final result

The property now benefits from a fully compliant, efficient sewage treatment plant that meets all regulatory standards. The homeowners expressed how very happy they were with both the installation process and the final outcome. Basement Pumps delivered a professional, reliable service that transformed the property’s outdated and non-compliant system into a modern, long-lasting solution.

contact us

up
error: Content is protected !!