SEWAGE TREATMENT PLANTS

Septic tank in Surrey

Case study overview

Date

October 2023

Location

Guildford, Surrey, UK

Industry Sector

Residential (upgrade for housing group)

Product Used

Tricel Novo UK 30

Project Introduction

This case study is about the installation of a new and efficient sewage treatment system to replace a non-compliant shared system for a group of houses. The client required our expertise in recommending a sewage treatment plant.

Our sales manager Barry Hodden was involved in this project.

Find out all the details about the project below.

Request a quote for your project today!

THE CHALLENGE

The primary challenge of this project was finding the appropriate sewage treatment unit that could be utilised by a group of houses with a non-compliant shared system. The customer was also concerned about the noise and smell.

The Installation

The specification of Tricel Novo

We recommended our Tricel Novo UK30. It was deemed the most appropriate system for this task, as it is suitable for housing estate installation and has low maintenance & running costs.

The process and follow up

After being recommended by Kent wastewater services Ltd, we spoke at length with the customer. With our installer, we discussed suitable location possibilities and they introduced a beehive box for our blower.

We met them on site and maintained communication with all the members of the housing group. Our team answered all the questions. So, the customer felt confident that our product and the service of our installer was the best choice.

The installation was completed in one week by Kent wastewater services Ltd.

Novo Surrey Installation process
Surrey Tricel Novo installation
Installation of Tricel Novo UK30

TRICEL SOLUTION

The solution we used : Tricel Novo UK 30

The Tricel Novo sewage treatment plants are reliable, easy to install and simple to maintain for all wastewater requirements. These highly functional plants can cater for ranges from 1 to 50 PE (Population Equivalent).

Tricel Novo sewage treatment plants are robust, reliable and durable.

The Feedback

As a result, the customer felt confident that our product and service of our installer was the best choice.

Tricel Novo uk 30 finished product Surrey
Septic tank Surrey

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Installation of Tricel Novo UK 18 in Devon

Tricel supplied a Novo UK 18 to replace an outdated septic tank in Devon. (Sept 2021)


2 min 30

Sewage treatment Installation

The aim was to find the perfect sewage treatment solution for a barn conversion and thus, upgrade their existing septic tank installation in line with their future projects. (Aug 2018)
3 min

Sewage treatment plant for selfbuilders

Only one week after the consent to discharge being granted, the installation process began. It then took only two days to complete the project. (Aug 2016)
3 min

Commercial sewage treatment plant and packaged filter system

Tricel worked with Carriden Homes in Crail (Scotland) to supply a sewage treatment plant and packaged filter system for bungalows. (Dec 2019)
2 min

Tricel Maxus Sewage Treatment Plant in Oykel Bridge

Tricel supplied a 92PE Tricel Maxus system with buffer tank for Oykel Bridge Hotel. (Dec 2021)
3 min 30

Commercial sewage treatment plant installed in Dorset

Tricel supplied a Novo UK 42 to replace an outdated septic tank in Dorset. (April 2021)
2 min 30

Cesspool replacement in Kent

Replacement of an existing cesspool by 3x Tricel Novo. (April 2022)
4 min

Septic tank upgrade, sewage treatment plant in Wiltshire

A Tricel sewage treatment plant was installed in Wiltshire to replace an old, failing septic tank. (March 2022)
2 min 45

See all Case studies

Source through all of our successful projects

Get in touch