SEWAGE TREATMENT PLANTS

Septic tank replacement in Somerset

Case study overview

Date

November 2022

Location

Somerset

Industry Sector

Household

Product Used

Tricel’s sewage treatment plant (Novo 6PE – pumped outlet)

Project Introduction

A Tricel sewage treatment plant was installed in Somerset to replace septic tank to be compliant with the 2020 rules.

Request a quote for your project today!

THE CHALLENGE

Septic tank replacement in Somerset to comply with the 2020 regulations and discharge into a watercourse located 50 meters from the treatment plant location

The installation was done by Below Ground Solutions.

The installation was completed in line with Tricel guidelines and Building control signed off the works once completed. The customer was so happy with the works.

Septic tank replacement in Somerset

The Installation

Previous slide
Next slide

TRICEL SOLUTION

Tricel Novo sewage treatment plant to comply with the 2020 rules.

A Tricel Novo 6 with a pumped outlet was recommended as the pump fitted is capable of pumping 200 meter distance over a 1 meter rise.

Tricel sewage treatment plants are a simple and effective means of disposing of wastewater without polluting the surrounding waterways or soil.

Key features of a Tricel Novo Sewage Treatment Plant

The Tricel sewage treatment plant offers :

  • Simple installation, flexible installation
  • A high-quality product with a 20 years warranty
  • Great final effluent  quality
  • Easy straight forward servicing
Septic tank installation in Somerset final result

The solution we used : Tricel Novo

The Tricel Novo submerged aeration sewage treatment plant is suitable for domestic and light commercial or communal applications.

The plant offers its own treatment system while using simple proven fixed bed technology

The Feedback

“Below Ground Solutions have just completed the installation of a tricel 6 sewage treatment plant at our property to replacing a septic tank. The quote and work schedule were detailed and the follow up after completion comprehensive. Installation was efficiently organised and completed on time and as per the quotation by a pleasant and competent installation team. We were kept informed as work progressed and importantly the price quoted for the installation was the price we paid. I would have no hesitation recommending Dan and his team.”

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Case Studies

Installation of Tricel Novo UK 18 in Devon

Tricel supplied a Novo UK 18 to replace an outdated septic tank in Devon. (Sept 2021)


2 min 30

Sewage treatment Installation

The aim was to find the perfect sewage treatment solution for a barn conversion and thus, upgrade their existing septic tank installation in line with their future projects. (Aug 2018)
3 min

Sewage treatment plant for selfbuilders

Only one week after the consent to discharge being granted, the installation process began. It then took only two days to complete the project. (Aug 2016)
3 min

Commercial sewage treatment plant and packaged filter system

Tricel worked with Carriden Homes in Crail (Scotland) to supply a sewage treatment plant and packaged filter system for bungalows. (Dec 2019)
2 min

Tricel Maxus Sewage Treatment Plant in Oykel Bridge

Tricel supplied a 92PE Tricel Maxus system with buffer tank for Oykel Bridge Hotel. (Dec 2021)
3 min 30

Commercial sewage treatment plant installed in Dorset

Tricel supplied a Novo UK 42 to replace an outdated septic tank in Dorset. (April 2021)
2 min 30

Cesspool replacement in Kent

Replacement of an existing cesspool by 3x Tricel Novo. (April 2022)
4 min

Septic tank upgrade, sewage treatment plant in Wiltshire

A Tricel sewage treatment plant was installed in Wiltshire to replace an old, failing septic tank. (March 2022)
2 min 45

See all Case studies

Source through all of our successful projects

Get in touch