SEWAGE TREATMENT PLANTS

Sewage Treatment Plant in Essex (Commercial Installation)

Case study overview

Date

October 2023

Location

Maldon, Essex, England

Industry Sector

Commercial – Restaurant

Product Used

Tricel Maxus Jupiter wastewater treatment

Project Introduction

>This case study is about sewage treatment plant essexClaremont Garden Centre is a well-established, family-owned garden centre with a three-decade history of delivering top-notch offerings. Their product range encompasses premium plants, shrubs, trees, and hedging, as well as an extensive assortment of decorative stone, paving, and fencing options. In addition, they offer a diverse collection of over 3,000 pots and troughs to meet their customers’ gardening needs.

They were in the process of opening a new restaurant and were looking for a sewage treatment plant in Essex that could cover their need for 100 population equivalents.

Our sales area manager, Barry Hodden, who covers the East and South East sides of the UK, managed this project.

Request a quote for your project today!

THE CHALLENGE

One of the challenges for this project was to reassure the customer about the installation of the sewage treatment plant.

Indeed, the customer has been in the building trade, so he was familiar with this business field. However, he wasn’t familiar with the sewage treatment field and was nervous about installing a wastewater treatment system.

Our team worked with the customer to understand his fears and advise him.

Claremont Garden - Maxus Jupiter - final result

The Installation

The specification of Tricel Maxus

Our team recommended our Tricel Maxus 100 population-equivalents system. Tricel worked very closely with the customer. They ensured the customer got everything he needed, including advice, answer to every question he could have and explanation about the product.

Our team came to the site and talked to him through the process. We kept in contact and answered his questions promptly.

The installation and follow-up

Once the customer ordered the Tricel Maxus system, we manufactured, delivered and installed it in 8 weeks. By the end of the works, the sewage treatment was ready for the restaurant’s opening in Spring 2024.

Claremont Garden - Maxus Jupiter - result
Claremont Garden - Maxus Jupiter installation-

TRICEL SOLUTION

The solution we used : Tricel Maxus

The Tricel Maxus is a robust commercial wastewater treatment solution tailored explicitly for projects exceeding a capacity 50PE. It harnesses the efficiency of Submerged Aerated Filter (SAF) technology.

Tricel Maxus sewage treatment systems are renowned for their durability and ease of installation, offering a range of customisable configurations to meet the diverse demands of different sites. They prioritise user-friendliness and require minimal maintenance throughout their operational lifespan.

These systems find versatile applications in various settings, such as housing estates, hotels, restaurants, campsites, industrial facilities, retail units, and more. The Tricel Maxus distinguishes itself as a highly cost-effective, all-in-one solution that manages varying incoming flows. This not only leads to reduced operational costs but also elevates the quality of the effluent produced.

Maxus Case study

The Feedback

Claremont Garden Centre owners were pleased with the result. According to them, we explained everything clearly and did what we said we would do.

Claremont Garden - Maxus Jupiter installation
Claremont Garden - Maxus Jupiter - result - closer look

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Installation of Tricel Novo UK 18 in Devon

Tricel supplied a Novo UK 18 to replace an outdated septic tank in Devon. (Sept 2021)


2 min 30

Sewage treatment Installation

The aim was to find the perfect sewage treatment solution for a barn conversion and thus, upgrade their existing septic tank installation in line with their future projects. (Aug 2018)
3 min

Sewage treatment plant for selfbuilders

Only one week after the consent to discharge being granted, the installation process began. It then took only two days to complete the project. (Aug 2016)
3 min

Commercial sewage treatment plant and packaged filter system

Tricel worked with Carriden Homes in Crail (Scotland) to supply a sewage treatment plant and packaged filter system for bungalows. (Dec 2019)
2 min

Tricel Maxus Sewage Treatment Plant in Oykel Bridge

Tricel supplied a 92PE Tricel Maxus system with buffer tank for Oykel Bridge Hotel. (Dec 2021)
3 min 30

Commercial sewage treatment plant installed in Dorset

Tricel supplied a Novo UK 42 to replace an outdated septic tank in Dorset. (April 2021)
2 min 30

Cesspool replacement in Kent

Replacement of an existing cesspool by 3x Tricel Novo. (April 2022)
4 min

Septic tank upgrade, sewage treatment plant in Wiltshire

A Tricel sewage treatment plant was installed in Wiltshire to replace an old, failing septic tank. (March 2022)
2 min 45

See all Case studies

Source through all of our successful projects

Get in touch