Once your sewage treatment system is fully installed, the last step is: the Commissioning Sewage Treatment Plant certificate.

You’ve opted for the top-tier Tricel Novo sewage treatment plant, and the system is ready to operate efficiently, providing you with optimal performance. To initiate the commissioning of your Tricel Novo, all you need to do is contact us.

A technician will then commission your sewage treatment plant in a few days and deliver a Commissioning Sewage Treatment Plant Certificate.

+44 (0)1934 422 311

If you have any questions, feel free to call us

Share on Facebook
Share on LinkedIn

When is the commissioning Sewage Treatment Plant certificate done?

Once the tank is installed, the plumbing and electrical connection should be completed in order to make sure your Tricel Novo is operational. To ensure the Tricel Novo sewage treatment plant is running correctly, you must book a commissioning appointment with a technician after installation. The technician will check if your sewage treatment plant is running properly.

Who does the commissioning Sewage Treatment Plant certificate?

The commissioning should be done by a competent person and according to the user manual.

Contact Tricel to get in touch with a qualified technician.

Tricel remains firmly committed to offering a high-quality service to its customers. Our priority is to provide a simple and robust product with an effective service.

How is the commissioning done?

Commissioning technician for novo

Once you book your commissioning, a technician checks your sewage treatment system. See below the checklist they will complete : 

  • Installation Check 
  • Blower Check 
  • Sludge Return Check 
  • Outlet Check Pump/Gravity 
  • Pump Operation Check 
  • Loss Of Pressure Check 
  • Alarm/Lights 

When is the Commissioning Sewage Treatment Plant certificate delivered?

Once the commissioning is done, a commissioning sewage treatment plant certificate will be delivered to you. This document contains the key information about yourself and your Tricel Novo, including : 

  • your name
  • the location of the installation
  • the number of your order
  • the model of your Tricel Novo 
  • the checklist listed above 

 

This certificate should be dated and signed by you and the technician who has done the commissioning.

Don’t forget to register your Tricel Novo - warranty requirement

Once your Tricel Novo Sewage Treatment plant is installed, you have 10 days to register your product to confirm the warranty.

Your right to protection under the terms and conditions of our limited warranty is confirmed by your product registration.

Once your Tricel Novo Sewage Treatment plant is installed, you have 10 days to register your product to confirm the warranty.

Your right to protection under the terms and conditions of our limited warranty is confirmed by your product registration.

The maintenance of your Tricel Novo

Maintenance and desludging are necessary for the Tricel Novo Sewage Treatment Plant at regular intervals.

Click below to see our maintenance page:

50 years in business

A highly successful multinational corporation with over 50 years’ valuable industry experience

SEWAGE TREATMENT PLANTS

Plants available for all capacities, from 1PE up to 50PE. Free advice on request.

Fast Delivery

On-time delivery is a core requirement of our successful business operations

Tricel Novo 8PE domestic sewage treatment plant - how does a domestic wastewater treatment plant work

Recent projects with Tricel Novo UK 6 treatment plant

Extensive industry experience, manufacturing since 1973.

Tricel manufacture deliver & install sewage treatment plants across a wide range of industry sectors throughout Ireland & the UK. Tricel also provide import/export services for our international clients. Top quality material offers outstanding capabilities including long life, durability and is a cost-effective solution for sewage treatment even in the harshest environments. 

Tricel has installed many of its Tricel Novo Sewage Treatment Plants across the UK.

Check some of our projects by clicking on the button below.

Frequently Asked Questions

A cesspool is a simple storage vessel with an inlet and no outlet. It’s a sealed storage vessel; all the water coming in stays within the tank. The advantage is it doesn’t need an outlet. The disadvantages are: there is no treatment, the tanks are huge, and it needs regular emptying. Everything which has gone in must be sucked out. Ideal for sites which have got very infrequent use (Sheppard huts, for example).

A septic tank has an inlet and an outlet; it’s a simple overflow system. See how a septic tank works here. The advantages of the septic tank are there is no mechanic and no electricity requirement for it to work. The disadvantages are you are discharging dirty water, and untreated sewage effluent, as a tiny breakdown has occurred in the tank. You can only release water to a drainage field for the water to go through the subsoil to treat the water.

A sewage or package treatment plant has an inlet and an outlet; the wastewater is treated inside the tank. Aeration is provided inside the tank for the aerobic bacteria to feed on the waste and remove it from the liquid. The advantages are the wastewater is treated and can be discharged to a watercourse. 

Many package treatment plants are available on the market:

  • Trickles filters
  • Rotating Biological Contactors (RBC)
  • Mobile media bio-reactors
  • Activated Sludge systems
  • Sequence Batch Reactor systems (SBR)
  • Fixed Bed Systems (like the Tricel Novo)

UK sewage treatment plants must comply with EN 12566-3 2005 regulations. 

You should also hire a professional to install your sewage treatment system. For any sewage treatment plants you intend to install, you should also check your local guidelines to determine if planning permission is required.

A sewage treatment plant is where domestic wastewater and sewage are treated. The sewage treatment plants break down organic matter through the primary settlement and aeration chambers. Sewage treatment plants require little maintenance and have low running costs, and sewage effluent is discharged into drainage fields or watercourses.

For example, the required standards are 20:30:20 for BOD, SS, and NH4.

Tricel® has achieved an 11:16:9 result during independent testing.

In order for the biomass to reach its optimum purification, it may take up to 16 weeks.

You may be able to discharge directly into a watercourse or to a percolation area depending on your region. Find out which option is best for you by contacting your local council.

The sewage treatment plant’s size depends on the effluent volume from your house. It is determined by the number of people using the system, which is calculated based on the number of bedrooms in your home. If you need further information, contact our team.

Occasionally, your sewage treatment plant will need to be emptied due to the accumulated sludge inside – usually once a year. The frequency of emptying your treatment plant depends on its size and usage. See our dedicated page about desludging septic tanks and wastewater treatment plants.

1) to prevent surface water from entering the tank and overloading the system as this can inhibit growth of the bacteria and could reduce the effluent quality.

2) to prevent water getting into blower housing which can harm the control panel and the air blower.

Learn more about Tricel Novo risers.

Get in touch